261 Upgrade Projects

On Oct. 19, 2018, Tennessee Gas Pipeline Company, L.L.C. (TGP), a subsidiary of Kinder Morgan, filed an application with the Federal Energy Regulatory Commission (FERC) for TGP’s 261 Upgrade Projects.

The 261 Upgrade Projects will create 72,400 dekatherms per day (Dth/d) of additional transportation capacity of natural gas on the existing Tennessee Gas Pipeline system. The 261 Upgrade Projects are both located in Agawam, Massachusetts and include the Looping Project and the Horsepower (HP) Replacement Project. The Looping Project involves the installation of 2.1 miles of a 12-inch diameter pipeline loop that will run parallel and adjacent to an existing TGP pipeline. The company will also remove an inactive 6-inch diameter pipeline and replace it with the new 12-inch diameter pipeline loop upgrade in certain locations. The HP Replacement Project involves the replacement of two existing turbine compressor units with one new, cleaner-burning turbine compressor unit, as well as the installation of auxiliary facilities at TGP’s existing Compressor Station 261.

Pending receipt of all required permits, construction will begin in March 2020 for the Looping Project and May 2020 for the HP Replacement Project. The projects are expected to be in service in November 2020.